Present Condition

Applied oil with UV block to help prevent further greying. Workshop in 2020

4.8m x 3m

Build Process

Initial Posts and rails in (2017). Workshop posts

Roof Structure (2018) Workshop in 2018

Douglas FIR Cladding from Abbey timber. Workshop cladding in 2018 Workshop cladding in 2018

Workshop cladding in 2018 Workshop cladding in 2018

Workshop cladding in 2018

Internal OSB Workshop in 2020

Bench Workshop in 2020

Adding some king posts over door way (2020). Workshop in 2020